Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Please answer the below question. You have a level track. You push a cart with m

ID: 1606402 • Letter: P

Question

Please answer the below question.

You have a level track. You push a cart with mass = 0.76[kg]. You measure the initial velocity to be 0.58[m s6-1]. 2 seconds later, you measure the velocity to be 0.435[m s^-1]. What is the work (reported in mJ) that friction did on the cart? Use three sig. figs, or N/A if not enough information is given, such as change in position! Remember, that if the system gains energy, then positive work is done; otherwise the system loses energy rightarrow work done on system

Explanation / Answer

Answer is : NA ,

Because of to calculate the workdone by friction ,the coefficient of kinetic friction must be given,