I need to expand this schedule (add more tasks) for a detailed Construction Engineering schedule, please help.
Earthwork Build embankments (using cut and fill) Grader or bulldozer levels screened dirt Gravel placement Open to Traffic Quality testing Placing permanent signage Placing temporary flags for construction site workers and hauling trucks Mobilization protection of surveying monuments and other markers temporary utility connections Site fence construction Erosion Control Personnel mobilization Installation of SWMP and BMPs TrailerExplanation / Answer
1. EARTHWORK
Upgrade of Public Road Haul Route
Install Temporary Accommodation
Install monitoring
Install dewatering wells
Upgrade existing drainage and silt ponds
Establish main access road to site
Upgrade emergency access roads.
2. OPEN TO TRAFFIC
Remove temporary fasteners
Establish early testing personnel
3. MOBILIZATION
Temporary Fencing
Labor shed making
Power connection
Water supply and Sanitation
Site Office
StorageGathering tools and machineries