Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Consider the dam spillway shown below having an impervious sheet pile cutoff Not

ID: 1827691 • Letter: C

Question

Consider the dam spillway shown below having an impervious sheet pile cutoff

Note: The elevation of the bottom of the spillway is 180.0 ft. Â The elevation of the top of the soil aquifier is 190 feet. Â The elevation of the bottom of the soil aquifier is 100 feet. Â The sheet piling is 45 feet long, and the sheet piling is 35 feet from the reservoir end of the spillway. Â The base of the spillway is 200 feet long


a) The coeficient of permeability for the soil aquifier is .001 ft/sec. Â Calculate the flow rate under the dam in ft^3/sec into the page


b) Plot the pore water pressure distribution along the base of the spillway

Explanation / Answer

Wait , i am solving , will post answer in few minutes
thanks