Branin Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $160,000, variable manufacturing overhead of $3.40 per direct labor- hour, and 80,000 direct labor-hours. The company has provided the following data concerning Job A578 which was recently completed:
The total job cost for Job A578 is closest to: (Round your intermediate calculations to 2 decimal places.)
Total direct labor-hours 250 Direct materials $ 715 Direct labor cost $ 9,000Explanation / Answer
Answer:
The total job cost for Job A578 is = $11,065
Working notes for the above answer is as under
First we determine predetermined overhead rate a sunder
=(160,000/80,000)+3.40
=$2 +$3.40
=$5.40
Direct material
715
Ditect labor
9000
Overhead cost (5.4*250)
1350
The total job cost for Job A578
11065
Direct material
715
Ditect labor
9000
Overhead cost (5.4*250)
1350
The total job cost for Job A578
11065