Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Car Mart pays $120,000 rent each year for its two-story building. The space in t

ID: 2489632 • Letter: C

Question

Car Mart pays $120,000 rent each year for its two-story building. The space in this building is occupied by five departments as specified here.

Car Mart pays $120,000 rent each year for its two-story building. The space in this building is occupied by five departments as specified here Paint department Engine department Window department Electrical department Accessory departmen 1,230 square feet of first-floor space 2,870 square feet of first-floor space 1,845 square feet of second-floor space 697 square feet of second-floor space ,558 square feet of second-floor space The company allocates 70% of total rent expense to the first floor and 30% to the second floor, and then allocates rent expense for each floor to the departments occupying that floor on the basis of space occupied Determine the rent expense to be allocated to each department. ount Allocated %Of Total Cost First floor Second floor Totals 0% $ 0 First Floor Paint Dept. Engine Dept. Totals Sq. Feet %Of Total Cost 0 0% $ 0 Second Floor Window Dept. Electrical Dept. Accessory Dept. Totals Sq. Feet %Of Total Cost 0 0% $ 0

Explanation / Answer

Amount allocated

% of Total

Cost

First floor

70%

$ 84,000

Second floor

30%

$ 36,000

Totals

100%

$ 120,000

First Floor

Sq. Feet

% of Total

Cost

Paint Department

                       1,230

30%

$ 25,200

Engine Department

                       2,870

70%

$ 58,800

Totals

                       4,100

$ 84,000

Second Floor

Sq. Feet

% of Total

Cost

Window Department

                       1,845

45%

$ 16,200

Electrical Department

                           697

17%

$ 6,120

Accessory Department

                       1,558

38%

$ 13,680

                       4,100

$ 36,000

Amount allocated

% of Total

Cost

First floor

70%

$ 84,000

Second floor

30%

$ 36,000

Totals

100%

$ 120,000

First Floor

Sq. Feet

% of Total

Cost

Paint Department

                       1,230

30%

$ 25,200

Engine Department

                       2,870

70%

$ 58,800

Totals

                       4,100

$ 84,000

Second Floor

Sq. Feet

% of Total

Cost

Window Department

                       1,845

45%

$ 16,200

Electrical Department

                           697

17%

$ 6,120

Accessory Department

                       1,558

38%

$ 13,680

                       4,100

$ 36,000