Fogerty Company makes two products-titanium Hubs and Sprockets. Data regarding t

ID: 2535635 • Letter: F

Question

Fogerty Company makes two products-titanium Hubs and Sprockets. Data regarding the two products follow: Direct Labor- Hours per Unit Production 0.80 28,000 units 0.40 56,000 units Annual Hubs Sprockets Additional information about the company follows a. Hubs require $22 in direct materials per unit, and Sprockets require $17 b. The direct labor wage rate is $12 per hour c. Hubs require special equipment and are more complex to manufacture than Sprockets d. The ABC system has the following activity cost pools Activit Estimated Overhead Cost $ 18,000 Activity Cost Pool (Activity Measure) Machine setups (number of setups) Special processing (machine-hours) General factory (organization-sustaining) Hubs Sprockets Total 180 100 $175,500 3,900 NA 80 0 3,900 NA $246,400 NA Required: 1. Compute the activity rate for each activity cost pool 2. Determine the unit product cost of each product according to the ABC system.

Explanation / Answer

Hubs

Sprockets

Direct Material

$22.00

$17.00

Direct Labor

$9.60

$4.80

Overhead

$6.63

$0.14

Un it Cost

$38.23

$21.94

(a)Compute the activity for each cost pool.

Activity Cost Pool

(a)Estimated Overhead Cost

(b)ExpectedActivity

(a) ÷ (b)

ActivityRateMachine

Machine setups

18000

180 setup

100 per setup

Special processing

175500

3900 MH

45 per MH

General factory

246400

0 DLH

0 per DLH

(b) Determine the unit cost of each product according to the ABC system, including direct materials and direct labor

Hubs

Activity Cost Pool

(a)Activity Rate

(b)Activity

(a) × (b)ABC Cos

Machine setups

100 per setup

100

10000

Special processing

45 per MH

3900

175500

General factory

0 per DLH

0

0

Total

185500

Sprockets:

Activity Cost Pool

(a)Activity Rate

(b)Activity

(a) × (b)ABC Cos

Machine setups

100 per setup

80

8000

Special processing

45 per MH

0

0

General factory

0 per DLH

0

0

Total

8000

Hubs

Sprockets

Direct materials

22.00

17.00

Direct labor:

$12 per DLH × 0.80 DLHs per unit

9.60

$12 per DLH × 0.40 DLHs per unit     

4.80

Overhead:

$ 185500 ÷ 28000 units

6.63

$ 8000 ÷ 56000 units    

0.14

Unit cost    

38.23

21.94

Hubs

Sprockets

Direct Material

$22.00

$17.00

Direct Labor

$9.60

$4.80

Overhead

$6.63

$0.14

Un it Cost

$38.23

$21.94