The ones in red are the wrong answers . is a modeling compilation strategy that
ID: 3575554 • Letter: T
Question
The ones in red are the wrong answers . is a modeling compilation strategy that combines the available 3D information into a single shared file. a Composite Model b. Consolidated Model d. All of the above Laser scanning is recommended for completing which feedback loop? a. Systems Installation b. Installation Management c. Installation Verification e. Field Issue Management The best time to train field personnel is a. As soon as possible b. 6 months prior to being placed on a project c. 6 months after being placed on a project d. Immediately before being placed on a project The bottleneck most construction firms face in bridging the knowledge gap to becoming BIM enabled exists at the level. a. Mid-level Management b. Executive dc. Field Staff d. Recruiting e. None of the above The process for updating as-built drawings and archiving old documents is known as a. As-building b. Redlining c. Slip-sheeting d. Record Modeling b. Redlining c. Slip-sheeting d. Record ModelingExplanation / Answer
Answers:
1. composite model
2. Installation Verification
3. 6 months prior to being placed on a project
4. Mid-level Management
5.Record Modeling