Universal AeroSpace wants to develop a backup plan and schedule for the virtual Web server. Develop and document a back up strategy for daily backups that could he used to restore files and recover files up to one-month old.
Your back up strategy should include a method to move the virtual server to another host within 2 hours if the primary host fails.
(*Just need the steps/suggestion what we need to follow. Not formal project. Hope that helps.)
Explanation / Answer
To perform backup strategy daily, it depends up on the server that is installed on the virtual server. For example if we install ERP server in the virtual server, it has its own backup tool BR tools. With its unique tool backup can be performed according to our requirement.
Scripting files have to be included in the operating system level to perform daily backup and it has to be online backup and in weekends an offline backup have to be planned. Offline backup ensures full system backup. These backup folders have to be stored in another instance. So that we can use these at the time of server failure.
Depending upon the server that is installed and data processed backup strategy has to be planned. To movie entire virtual server when primary instance is failed is known as Data recovery strategy.
Data recovery strategy involves secondary server host instance. When you failed the primary replica to the DR site, you may have also adjusted the node weights of those nodes hosting availability group replicas. It is time to set the node weight back, removing the node weight from the DR site and adding it back to the nodes a the primary data center.