Tim Nelson is a chair inspector for La-Z-Boy where he is expected to inspect 130 chairs per day. a Tim works an 8-hour day therefore, the number of minutes he has available or performing each inspection le Tim's standard time = 3.69 minutes round your response to two decimal places) b) Tim is allowed to have a 6% fatigue allowance, a 5% delay allowance, and 8% for personal time. With this additional information available, the normal time assumed for Tim to complete each inspection minutes (round your response to two decimal places)Explanation / Answer
Total time allowance given to Tim = (6+5+8)%
= 19%
Therefore the normal time assumed for Tim to complete each inspection = (81/100)*3.69
= 2.99 Minutes