3. (TCO 3) Which of the following is a goal of JIT partnerships? (Points : 3) Re
ID: 462196 • Letter: 3
Question
3. (TCO 3) Which of the following is a goal of JIT partnerships? (Points : 3) Reduce inventory and variabilityIncrease variability
Increase in-transit inventory
Elimination of engineering changes Question 4.4. (TCO 3) Which of the following is not a benefit of small production lots? (Points : 3) Work-in-process inventory is smaller
Holding costs decrease
Workstations can be placed closer together
Manufacturing cycle time is longer 3. (TCO 3) Which of the following is a goal of JIT partnerships? (Points : 3) Reduce inventory and variability
Increase variability
Increase in-transit inventory
Elimination of engineering changes
Explanation / Answer
3. goal of JIT partnership is: Reduce inventory and variability
4. Manucaturing cycle time is longer
In small production lots, as the work-in progress is less, the workstations are placed closer together, the setup times are reduced, and inventory level is less which over all results in reduction in manufacturing cycle time,