Lp Problem 1a Standard Problem Formulamax 02a015b01cst03a0 ✓ Solved
LP Problem 1 A) Standard problem formula: Max 0.2A+0.15B+0.1C S.t. 0.3A+0.5B+0.4C <= 1800 (assembly hours) 0.1A+0.08B+0.12C <= 800 (inspection hours) 0.06A+0.04B+0.05C <= 700 (packing hours) A, B, C >= 0 B) D) 6,000 units of product A should be produced per week and 0 units of each product B and C should be produced. This strategy will result in total profit of
,200 per week. LP Problem 2 Two products are made by blending three raw materials according to these specifications: Material Price/Pound Product A 10% ≥30% ≤80% .00 B ≥30% ≥20% ≤60% .00 Mat’l Avail ,000 Mat’l Cost