In the space next to the name of each of the remediation sites we studied, write
ID: 1711124 • Letter: I
Question
In the space next to the name of each of the remediation sites we studied, write in the letters corresponding to major activities that occurred/are occurring at that site. Include all that apply(+point each): penalty (-1 point) for including an activity that has not occurred a. Remedial sediment dredging b. Remedial sediment capping c. Monitored natural attenuation d. Construction of in-water CDF(s) e. On-site stabilization/treatment wastes Marathon Battery Site Eagle Harbor Site Ross Island Sand & Gravel Match up the following entities with the (one) chemical contaminant most likely associated with it.Explanation / Answer
Hi,
Plz post if any diffiuclties.
Thanks.
Marathon battery site - A,C,D,E
Eagle Harbour site - C,D,E
Ross Island Sand and Gravel -A,B,C,E