Please can you provide me the name of the detail and: 1. Function of system 2. S
ID: 1712021 • Letter: P
Question
Please can you provide me the name of the detail and:
1. Function of system
2. Sequence of construction
3. quility/inspections/testing
CSI SPEC #04 22 00 FUN of more reinforce mertton would be possible osina bedmnt be walls to Serve o horizont the bp & the vals, hying the vels bgether They can be used belouw a line of bar sists Thry ean be used belbuo line of bar jpists, so thol thest SEQUENCE OF CONSTRUCTION: Plastic mesh -Place hrst bord beom Course, Ing in rebar on the topd he bloc Plaxce secorol bondd beom Coufse Plce stinps n blocks - Consolidade fout sith a concrote br ator Entire bond beam must be ost at the some Lume 2Albus Anixhed bond beom to cure bohurs bebre stee Plusb'c mesh QUALITY / INSPECTIONS/TESTING: TITLE:Bond pean etail Rev. 1 - 9/6/17 Rev. 1-9/6/17Explanation / Answer
STEEL JOIST TO MASONRY BEARING WALLS
When a roof joist spans its max-
imum length and carries its maxi-
mum allowable load, the ends of
the joist will rotate. This inward
movement (joist shortening) is
the result of deflection. If this con-
dition is overlooked, the masonry
can bow and crack.
CONSTRUCTION
A connection should be de-
signed so that it can be installed
easily. It needs to be adjustable
since distances between bearing
points can vary by an inch or
more due to construction toler-
ances. In addition, the anchor
bolts set in the masonry during
construction can be misaligned.