Please can you provide me the name of the detail and: 1. Function of system 2. S

ID: 1712021 • Letter: P

Question

Please can you provide me the name of the detail and:

1. Function of system

2. Sequence of construction

3. quility/inspections/testing

CSI SPEC #04 22 00 FUN of more reinforce mertton would be possible osina bedmnt be walls to Serve o horizont the bp & the vals, hying the vels bgether They can be used belouw a line of bar sists Thry ean be used belbuo line of bar jpists, so thol thest SEQUENCE OF CONSTRUCTION: Plastic mesh -Place hrst bord beom Course, Ing in rebar on the topd he bloc Plaxce secorol bondd beom Coufse Plce stinps n blocks - Consolidade fout sith a concrote br ator Entire bond beam must be ost at the some Lume 2Albus Anixhed bond beom to cure bohurs bebre stee Plusb'c mesh QUALITY / INSPECTIONS/TESTING: TITLE:Bond pean etail Rev. 1 - 9/6/17 Rev. 1-9/6/17

Explanation / Answer

STEEL JOIST TO MASONRY BEARING WALLS

When a roof joist spans its max-

imum length and carries its maxi-

mum allowable load, the ends of

the joist will rotate. This inward

movement (joist shortening) is

the result of deflection. If this con-

dition is overlooked, the masonry

can bow and crack.

CONSTRUCTION

A connection should be de-

signed so that it can be installed

easily. It needs to be adjustable

since distances between bearing

points can vary by an inch or

more due to construction toler-

ances. In addition, the anchor

bolts set in the masonry during

construction can be misaligned.