Inovation credits are lyim EED BD-C mating sywtens b Have only been around since

ID: 1738110 • Letter: I

Question

Inovation credits are lyim EED BD-C mating sywtens b Have only been around since LEED 2009 c In every rating system d. Only available to Gold and Platinum certified pejects s. Generalily held at the beginning of the projevct, what process brings together the esperts for creative thinking and collaboration and to assist in establishing goals project leam with stakeholders and outside a Small tssk group h. Stakeholder meeting c Charette d. Team meeting 9. The integrative process should be started a. Before the design process begins. b. Between the design and construction process As soon as the project team is assembled regardless of what stage design is n 10. All LEED Gireen Associates must earn 15 continuing edacation hours within 2 years of carning their credentials, which can be earned through the following activities a Education b. Project experience c Volunteering d. All of the above 11. Embodied energy is best descrnibed as a. A process used in design that involves conducting nesearch, sharing data, receiving feedback, and refining the design h. An analytic tool used to determine the most cost-effective opsion among competing ahematives hased on the costs c The total amount of energy used to extract matenals and manufacture, trassport, install, and use a product across its d. A section of a system in which the system self corrects and stays within a particular set of paramesers repeatedly of the option throughout their life cycles life cycle 12. The Sustainable Sites (SS) calegory covers thrce ancas: a. Developing a site management plan, implementing conservation programs, and maintaining site lighting to prevent light pollution b. Location, building rease, reducing transportation c. Minimizing impervious areas, controlling rainwater,incorporating rainwater management into site design d. Site design and management, rainwater management, heat sland effect 13. The Materials and Resources (MR) category focuses on: a. Educating project teams on how to select green building materials that help meet the strict new enviroemental product declaration requirements h. Encouraging project tcams to look at the individual sustainable characteristics of each product used on the project instead of using a holistic approach and focusing on a product's life cycle

Explanation / Answer

7) c) In every rating system

8) b stackholder meeting

9) b between the design and construction progress

10) All of the above

11) c

12) b