Michigan Machining Company machines metal parts for the automotive industry. Und

ID: 2372489 • Letter: M

Question

Michigan Machining Company machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 60 parts. A part requires 5 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 10 minutes.
Under the just-in-time philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 5 parts and the move time is eliminated.


Determine the value-added, non-value-added, total lead time, and the value-added ratio under the traditional and just-in-time manufacturing methods. If required, round percentages to one decimal place.

A)
Traditional Philosophy

1. Value-added time _________ min

2. Non-value-added time ________ min

3. Total lead time _________ min

4. Value-added ratio (as a percent) _______ %

B)
Just-in-Time Philosophy

1. Value-added time _________ min

2. Non-value-added time ________ min

3. Total lead time _________ min

4. Value-added ratio (as a percent) _______ %

Explanation / Answer

Value Added time = Milling time + finishing time

Non-Value Added time = Value Added time X (Batch size - 1) + Move time

Lead time = Value Added time + Non-Value Added time

Traditional Philosophy

Value Added time = Milling + finishing time = 5+7 = 12 minutes

Non-Value Added time = Value Added time X (Batch size - 1) + Move time = 12*(60-1) + 10 = 718 minutes

Lead time = 12 + 718 = 730 minutes

Value-Added Ratio = Value Added time / Lead time = 12 / 730 = 1.6%

Just-In-Time Philosophy

Value Added time = Milling time + finishing time = 5+7 = 12 minutes

Non-Value Added time = Value Added time X (Batch size - 1) + Move time = 12*(5-1) + 0 = 48 minutes

Lead time = 12 + 48 = 60 minutes

Value-Added Ratio = Value Added time / Lead time = 12 / 60 = 20%

Traditional Philosophy Just-In-Time Philosophy Value-added time 12 min 12 min Non-value-added time 718 min 48 min Total lead time 730 min 60 min Value-added ratio (as a percent) 1.6% 20%