Consider the spreadsheet for Stone Age Surfboards provided below. Use this data
ID: 3325116 • Letter: C
Question
Consider the spreadsheet for Stone Age Surfboards provided below. Use this data to answer the following question(s), using the Standard Solver.
Stone Age Surfboards is a small manufacturer of two types of popular low-tide surfboards, the Graystone and the Lava models. The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 8 skilled workers, each of whom works 9.25 hours per day. The finishing department has 5 workers, each of whom works a 6-hour shift per day. Each pair of Graystone surfboards requires 2.5 labor hours in the fabrication department and 2 labor hours in finishing. The Lava model requires 4.2 labor-hours in fabrication and 3.6 labor-hours in finishing. The company operates 6 days a week. It makes a per unit profit of $40 on the Graystone model and $60 on the Lava model. The company anticipates selling at least twice as many Lava models as Graystone models.
Explanation / Answer
STarting with A1 in the excel sheet
After solving
the total number of fabrication hours is 34.4 hours
Graystone Lava Fabrication 2.5 4.2 Finishing 2 3.6 qty produced 2 7 Hours used Fabrication =+B5*B2 =+C5*C2 =+SUM(B8:C8) 74 Finishing =+B5*B3 =+C5*C3 =+SUM(B9:C9) 30 Profit/unit 40 60 Total profit =+B12*B5 =+C12*C5 =+B14+C14