Question 1 (1 point) For in-house development, the __________ option should be c

ID: 3568592 • Letter: Q

Question

Question 1 (1 point)

For in-house development, the __________ option should be considered only for specialized IT apps for which components are not available because this option is expensive and slow.

Question 1 options:

Build from components

Build from scratch

Integrating applications

Prototyping

Question 2 (1 point)

End-user development has risks and limitations, which include each of the following except:

Question 2 options:

End users may not be skilled enough in computers, so quality and cost may be jeopardized.

End users may not take time to document their work

End users may neglect proper security measures.

There may be an endless loop of prototype revisions.

Question 3 (1 point)

Projects are managed by managing the triple constraints. Which is not one of those constraints?

Question 3 options:

Approval

Scope

Time

Budget

Question 4 (1 point)

A project plan is specified in a __________.

Question 4 options:

Resource pool

Gantt chart

Work breakdown structure (WBS)

Critical path

Question 5 (1 point)

Project managers need to recognize the risk of __________, which is the piling up of small changes that by themselves are manageable, but collectively can cause significant project growth.

Question 5 options:

Over allocation

Critical path

Triple constraints

Scope creep

Question 6 (1 point)

The success of a project manager depends on all of the following except:

Question 6 options:

Use of the critical path method and Gantt charts

Clear, open, and timely communication

Accurate, timely, and complete information

Commitment from team members

Question 7 (1 point)

The __________ is the traditional systems development method used by organizations for large IT projects such as IT infrastructure.

Question 7 options:

Prototyping method

Systems development life cycle (SDLC)

Critical path method

Sourcing method

Question 8 (1 point)

Which is not a characteristic of program testing?

Question 8 options:

Testing verifies that computer code works correctly under various conditions.

Syntax errors are easier to find than logic errors because they prevent the program from running.

Logic errors are difficult to detect because they permit the program to run but result in incorrect output.

Proper testing can be done quickly and with little effort.

Question 9 (1 point)

__________ conversion is the least expensive and highest risk IS conversion strategy because the old system is cut off and the new system is turned on at a certain point in time.

Question 9 options:

Parallel

Direct

Pilot

Phased

Question 10 (1 point)

During the systems investigation stage, __________ studies are done to determine if the hardware, software, and communications components can be developed and/or acquired to solve the business problem.

Question 10 options:

Economic feasibility

Technical feasibility

ROI

NPV

A)

Build from components

B)

Build from scratch

C)

Integrating applications

D)

Prototyping

Question 1 (1 point) Question 10 Unsaved During the systems investigation stage, __________ studies are done to determine if the hardware, software, and communications components can be developed and/or acquired to solve the business problem. Question 10 options: A) Economic feasibility B) Technical feasibility C) ROI D) NPV Question 9 Unsaved __________ conversion is the least expensive and highest risk IS conversion strategy because the old system is cut off and the new system is turned on at a certain point in time. Question 9 options: A) Parallel B) Direct C) Pilot D) Phased Question 10 (1 point) Question 8 Unsaved Which is not a characteristic of program testing? Question 8 options: A) Testing verifies that computer code works correctly under various conditions. B) Syntax errors are easier to find than logic errors because they prevent the program from running. C) Logic errors are difficult to detect because they permit the program to run but result in incorrect output. D) Proper testing can be done quickly and with little effort. Question 9 (1 point) Question 7 Unsaved The __________ is the traditional systems development method used by organizations for large IT projects such as IT infrastructure. Question 7 options: A) Prototyping method B) Systems development life cycle (SDLC) C) Critical path method D) Sourcing method Question 8 (1 point) Question 6 Unsaved The success of a project manager depends on all of the following except: Question 6 options: A) Use of the critical path method and Gantt charts B) Clear, open, and timely communication C) Accurate, timely, and complete information D) Commitment from team members Question 7 (1 point) Question 5 Unsaved Project managers need to recognize the risk of __________, which is the piling up of small changes that by themselves are manageable, but collectively can cause significant project growth. Question 5 options: A) Over allocation B) Critical path C) Triple constraints D) Scope creep Question 6 (1 point) Question 4 Unsaved A project plan is specified in a __________. Question 4 options: A) Resource pool B) Gantt chart C) Work breakdown structure (WBS) D) Critical path Question 5 (1 point) Question 3 Unsaved Projects are managed by managing the triple constraints. Which is not one of those constraints? Question 3 options: A) Approval B) Scope C) Time D) Budget Question 4 (1 point) Question 2 Unsaved End-user development has risks and limitations, which include each of the following except: Question 2 options: A) End users may not be skilled enough in computers, so quality and cost may be jeopardized. B) End users may not take time to document their work C) End users may neglect proper security measures. D) There may be an endless loop of prototype revisions. Question 3 (1 point) Question 1 Unsaved For in-house development, the __________ option should be considered only for specialized IT apps for which components are not available because this option is expensive and slow. Question 1 options: A) Build from components B) Build from scratch C) Integrating applications D) Prototyping Question 2 (1 point)

Explanation / Answer

1. B

2. D

3. A

4. C

5. D

6. A

7. B

8. D

9. B

10. B

These will get you 100%...the guy who commented to the above answers is correct!