Question 1 (1 point) For in-house development, the __________ option should be c
ID: 3568821 • Letter: Q
Question
Question 1 (1 point)
For in-house development, the __________ option should be considered only for specialized IT apps for which components are not available because this option is expensive and slow.
Question 1 options:
Build from components
Build from scratch
Integrating applications
Prototyping
Save
Question 2 (1 point)
End-user development has risks and limitations, which include each of the following except:
Question 2 options:
End users may not be skilled enough in computers, so quality and cost may be jeopardized.
End users may not take time to document their work
End users may neglect proper security measures.
There may be an endless loop of prototype revisions.
Save
Question 3 (1 point)
Projects are managed by managing the triple constraints. Which is not one of those constraints?
Question 3 options:
Approval
Scope
Time
Budget
Save
Question 4 (1 point)
A project plan is specified in a __________.
Question 4 options:
Resource pool
Gantt chart
Work breakdown structure (WBS)
Critical path
Save
Question 5 (1 point)
Project managers need to recognize the risk of __________, which is the piling up of small changes that by themselves are manageable, but collectively can cause significant project growth.
Question 5 options:
Over allocation
Critical path
Triple constraints
Scope creep
Save
Question 6 (1 point)
The success of a project manager depends on all of the following except:
Question 6 options:
Use of the critical path method and Gantt charts
Clear, open, and timely communication
Accurate, timely, and complete information
Commitment from team members
Save
Question 7 (1 point)
The __________ is the traditional systems development method used by organizations for large IT projects such as IT infrastructure.
Question 7 options:
Prototyping method
Systems development life cycle (SDLC)
Critical path method
Sourcing method
Save
Question 8 (1 point)
Which is not a characteristic of program testing?
Question 8 options:
Testing verifies that computer code works correctly under various conditions.
Syntax errors are easier to find than logic errors because they prevent the program from running.
Logic errors are difficult to detect because they permit the program to run but result in incorrect output.
Proper testing can be done quickly and with little effort.
Save
Question 9 (1 point)
__________ conversion is the least expensive and highest risk IS conversion strategy because the old system is cut off and the new system is turned on at a certain point in time.
Question 9 options:
Parallel
Direct
Pilot
Phased
Save
Question 10 (1 point)
During the systems investigation stage, __________ studies are done to determine if the hardware, software, and communications components can be developed and/or acquired to solve the business problem.
Question 10 options:
Economic feasibility
Technical feasibility
ROI
NPV
A)Build from components
B)Build from scratch
C)Integrating applications
D)Prototyping
During the systems investigation stage, __________ studies are done to determine if the hardware, software, and communications components can be developed and/or acquired to solve the business problem. Question 10 options: A) Economic feasibility B) Technical feasibility C) ROI D) NPV Question 9 Unsaved __________ conversion is the least expensive and highest risk IS conversion strategy because the old system is cut off and the new system is turned on at a certain point in time. Question 9 options: A) Parallel B) Direct C) Pilot D) Phased Save Question 10 (1 point) Question 8 Unsaved Which is not a characteristic of program testing? Question 8 options: A) Testing verifies that computer code works correctly under various conditions. B) Syntax errors are easier to find than logic errors because they prevent the program from running. C) Logic errors are difficult to detect because they permit the program to run but result in incorrect output. D) Proper testing can be done quickly and with little effort. Save Question 9 (1 point) Question 7 Unsaved The __________ is the traditional systems development method used by organizations for large IT projects such as IT infrastructure. Question 7 options: A) Prototyping method B) Systems development life cycle (SDLC) C) Critical path method D) Sourcing method Save Question 8 (1 point) Question 6 Unsaved The success of a project manager depends on all of the following except: Question 6 options: A) Use of the critical path method and Gantt charts B) Clear, open, and timely communication C) Accurate, timely, and complete information D) Commitment from team members Save Question 7 (1 point) Question 5 Unsaved Project managers need to recognize the risk of __________, which is the piling up of small changes that by themselves are manageable, but collectively can cause significant project growth. Question 5 options: A) Over allocation B) Critical path C) Triple constraints D) Scope creep Save Question 6 (1 point) Question 4 Unsaved A project plan is specified in a __________. Question 4 options: A) Resource pool B) Gantt chart C) Work breakdown structure (WBS) D) Critical path Save Question 5 (1 point) Question 3 Unsaved Projects are managed by managing the triple constraints. Which is not one of those constraints? Question 3 options: A) Approval B) Scope C) Time D) Budget Save Question 4 (1 point) Question 2 Unsaved End-user development has risks and limitations, which include each of the following except: Question 2 options: A) End users may not be skilled enough in computers, so quality and cost may be jeopardized. B) End users may not take time to document their work C) End users may neglect proper security measures. D) There may be an endless loop of prototype revisions. Save Question 3 (1 point) Question 1 Unsaved For in-house development, the __________ option should be considered only for specialized IT apps for which components are not available because this option is expensive and slow. Question 1 options: A) Build from components B) Build from scratch C) Integrating applications D) Prototyping Save Question 2 (1 point)Explanation / Answer
1)B
2)D
3)A
4)C
5)D
6)A
7)B
8)D
9)B
10)B