Master Chef Appliance Company manufactures home kitchen appliances. The manufact

ID: 2594308 • Letter: M

Question

Master Chef Appliance Company manufactures home kitchen appliances. The manufacturing process includes stamping, final assembly, testing, and shipping. In the stamping operation, a number of individuals are responsible for stamping the steel outer surface of the appliance. The stamping operation is set up prior to each run. A run of 40 stampings is completed after each setup. A setup requires 60 minutes. The parts wait for the setup to be completed before stamping begins. Each stamping requires 10 (TEN) minutes of operating time. After each batch is completed, the operator moves the stamped covers to the final assembly area. This move takes 14 (FOURTEEN) minutes to complete.

The final assembly for each appliance unit requires 22 minutes and is also done in batches of 40 appliance units. The batch of 40 appliance units is moved into the test building, which is across the street. The move takes 25 minutes. In the final test, the 40-unit batch is tested one at a time. Each test requires 8 minutes. The completed units are sent to shipping for packaging and final shipment to customers. A complete batch of 40 units is sent from testing to shipping. The Shipping Department is located next to testing. Thus, there is no move time between these two operations. Packaging and shipment labeling requires 15 minutes per unit.

Required:

1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average kitchen appliance in a batch of 40 units. Round percentages to one decimal place. Categorize the non-value-added time into wait and move time.

Explanation / Answer

Solution:-

1.

Please Rate or comment if you have any doubt regarding this solution.

Value-added time: Stamping 10 Appliance Assembly 22 Time to Test One Unit 8 Pack and Shipment Labeling 15 Total 55 Non-value-added time: Wait Time: Within batch wait time - stamping (40 x 10) 400 Within batch wait time - final assembly (40 x 22) 880 Within batch wait time - testing (40 x 8) 320 Within batch wait time - shipping (40 x 15) 600 Stamping Setup 60 Total Wait Time 2,260 Move Time: Move from stamping to final assembly 14 Move from final assembly to testing 25 Total Move Time 39 Total Non-value -added time 2,299 Total Lead Time (55 + 2,299) 2,354 Value-added ratio (55 / 2,354) 2.34%