Mat 122 Project G A bicycle manufacturer makes a three-speed model and a ten-speed model. with two operations, assembly and painting. Each three-speed bike requires 1 hour to assemble and 2 hours to paint. Each ten-speed bike requires!- hour to assemble and 1 hour to paint. The assembly operation has 80 work hours per week available, and the painting operation has 100 work hours available each week. If the company makes $80 on each three-speed and 560 on each ten-speed bike, how many bicydles should be made and sola each week to maximize profits? on echwu ConshaitsExplanation / Answer
Solved the first linear problem as per Chegg guidelines, post multiple question to get teh remaining answers
Mat 122 Project G
Let the number of three speed bikes be x
Let the number of ten speed bikes be y
Constraints:
x + y <= 80 (for assemble)
2x + y <= 100 (for painting)
x>=0, y>=0 (since the number of cycles cannot be less than zero)
Objective Function:
Maximize z = 80x + 60y
Now in order to maximize the function, we need to solve
x + y = 80
2x + y = 100
x = 20 and y = 60